I agree with Jim's article whole-heartedly. It is very painful to have a delay of this magnitude. In the current atmosphere of "why is this taking so long," the answer is clear. The work must be done and it must be done correctly. The old adage of "haste makes waste" rings true here.

Peter S. Shenkin's avatar

It is well to remember that the subway L line's East-River tunnel was also devastated by Sandy. Renovation at this level was proposed, but engineers found a better way and did it in a short period of time and much lower expense. So far, that has been extraordinarily successful. I understand that using that technology was rejected by Amtrak, and maybe it was in fact inapplicable, but I never saw or heard what the arguments against it were.

The reasons a bare-bones reconstruction was decided upon might have to do with Amtrak's plan to run through service of Amtrak trains arriving from NJ to Penn Station through the new tunnel into Long Island. Thus, one would (presumably) be able to get on an Amtrak train someplace in Long Island (Jamaica? Ronkonkoma?) and travel to, say, DC without changing trains. That is a laudable goal. The heavy, concentrated weight of a locomotive engine places greater stress on tunnel infrastructure than does the distributed weight of a commuter-rail train. This might have to do with the reason a bare-bones rebuild was selected.

But it would be good to hear from the horse's mouth what the rationale was. (Not horse's -- I meant the steam engine's mouth. No, the diesel's mouth. No, the electric locomotive's mouth....😊)

No posts

Ready for more?